What We Do

Services

Everything we build, fix and maintain once a deck's on the ground.

Home › Services

Everything we take on

Every job below is one we do ourselves across Weslaco.

Custom Deck Design

We draw up the layout before we cut a single board, working around door swings, drainage slope and how much shade you actually get in July. Multi-level decks and wraparound designs cost more in footings and beams, so that gets priced out up front.

Deck Installation

We set footings below grade, bolt a flashed ledger board to the rim joist, and frame with pressure-treated joists on 16-inch centers. Composite decking calls for tighter spacing, usually 12 inches, and we build that into the framing from the start.

Deck Repair

Most repair calls are a soft spot where water got behind the ledger flashing, or a post base that's rotted off where it meets the concrete. We replace what's compromised and fix the water path that caused it, not just the board on top.

Deck Staining & Sealing

South Texas sun breaks down an unsealed deck fast, and a cheap film-forming stain will peel in a season. We strip, sand and apply a penetrating stain rated for UV, then walk you through how often that has to happen given your sun exposure.

Composite Decking

Composite boards don't rot or splinter, but they expand and contract more than wood with our heat swings, so gap and fastener spacing matter more than people think. We install with hidden fastener systems so the surface stays clean.

Deck Railing Installation

Local code calls for baluster spacing that won't pass a 4-inch sphere through, and posts that can take a 200-pound lateral load. We run cable rail, wood baluster and aluminum panel systems depending on the look you want and the budget.

Deck Resurfacing

If the frame underneath is still sound, we can pull the old decking and railing and put down new boards without touching the footings or joists. It's a cheaper option than a full rebuild when the structure tests solid.

Pergolas & Shade Structures

A bare deck in a Weslaco summer gets too hot to stand on by mid-morning. We build cedar and composite pergolas sized to the deck's footings, and can add retractable shade cloth or polycarbonate panels for real afternoon shade.

Screened-In Porches

Mosquitoes and an open deck in the evening don't mix. We frame a screen enclosure off an existing deck or build one new, with a door that actually latches and a screen gauge that holds up to Valley bugs.

Deck Demolition & Removal

Old decks built without permits or proper footings sometimes aren't worth saving, especially if the ledger connection was never flashed right. We tear out and haul off the old structure and can quote a rebuild on the same visit.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Weslaco, TX

We travel to most addresses within about 50 miles of Weslaco.

Weslaco, TX
Brownsville, TX
McAllen, TX
Mission, TX
Edinburg, TX
Pharr, TX
Harlingen, TX
Alamo, TX
San Juan, TX
Mercedes, TX
Donna, TX
La Feria, TX
Common Questions

Things worth asking

Questions that come up once a project is actually underway.

Do I need a permit to build a deck?
Most municipalities in the Rio Grande Valley require a permit for any deck attached to the house or built more than 30 inches above grade, including inspections at the footing and framing stages. Freestanding decks under that height sometimes skip the permit requirement, but local code should be confirmed before work starts.
How long does it take to build a deck?
A standard single-level deck of around 300 square feet usually takes one to two weeks from footing excavation to final staining, weather permitting. Multi-level decks, screened porches, or composite decking with hidden fastener systems can add several more days to the schedule.
Can a deck be built on a budget?
Pressure-treated pine framing and decking keeps costs lower than composite or cedar, and simplifying the railing style or skipping a second level cuts both material and labor cost significantly. A contractor can usually offer two or three options at different price points during the quoting stage.
Do you offer a warranty on deck construction?
Workmanship warranties on deck construction typically cover framing and installation defects for one to a few years, while material warranties on composite decking or pressure-treated lumber come separately from the manufacturer. Ask specifically what's covered since structural issues and surface wear are usually treated differently.
Who do I deal with day to day during the project?
On most deck projects, the lead carpenter or crew foreman is the main point of contact on site, handling day-to-day questions while the office manages scheduling and invoicing. Getting a direct number for the person actually on site cuts down on delays getting small decisions answered.
What decking material should I choose?
Pressure-treated pine is the cheapest option but has to be stained every two to three years and can splinter over time, while composite decking costs more upfront but resists rot and doesn't require sealing, just periodic cleaning. Cedar sits in between on price and offers a natural look but still requires regular sealing to handle intense UV exposure.
Can I still use my yard or house during deck construction?
Yard access is usually limited near the construction zone for safety, especially during footing excavation and concrete work, but most of the property stays usable throughout a deck project. Decks attached to the house may briefly block a back door or slider during ledger board installation.
What should I do to prepare the site before a deck build starts?
Clearing furniture, planters and grills from the work area, and marking the location of any sprinkler lines or buried utilities, speeds up the first day of a deck project significantly. Calling 811 for a utility locate before footing excavation is standard practice and sometimes required by local code.
What happens if something unexpected turns up mid-project, like rotted framing or a buried utility line?
Hidden problems like rotted rim joists behind existing siding or an unmarked irrigation line are addressed as soon as they're found, usually with a change order outlining the extra cost and time before additional work proceeds. Most reputable contractors won't do extra work without the homeowner's sign-off first.
How should a finished deck be maintained?
Wood decks typically require restaining every two to three years in a climate with intense UV exposure, along with an annual check of fasteners and railing connections for looseness. Composite decking mainly requires periodic washing to remove pollen and mildew, plus a yearly look at the ledger flashing and footings for any sign of water intrusion.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (956) 477-5349